古典吧>英语词典>constrains翻译和用法

constrains

英 [kənˈstreɪnz]

美 [kənˈstreɪnz]

v.  强迫; 强制; 迫使; 限制; 限定; 约束
constrain的第三人称单数

柯林斯词典

  • VERB 约束;限制;强迫
    Toconstrainsomeone or something means to limit their development or force them to behave in a particular way.
    1. Women are too often constrained by family commitments and by low expectations...
      女性往往受到家庭责任和低期望值的束缚。
    2. How can we produce top-class engineers when universities are constrained to offer salaries that can only attract mediocre staff?...
      大学的财力有限,提供的薪酬仅能吸引水平一般的教师,在这种情况下,我们如何能培养出一流的工程师?
    3. It's the capacity of those roads which is going to constrain the amount of travel by car that can take place.
      制约驾车出行量的将会是那些道路的通行能力。
  • PHRASE 觉得被迫(做某事)
    If youfeel constrained todo something, you feel that you must do it, even though you would prefer not to.
    1. For some reason he felt constrained to lower his voice.
      不知怎么的,他觉得自己必须得压低声音。

双语例句

  • The discovery of synergism in virus-resistant transgenic plants severely constrains the of transgenic plants.
    抗病毒转基因植物中协生作用的出现,严重限制了基因工程植物的商品化生产。
  • It imposes constrains, restricting nature's freedom.
    它具有限制自然界自由度的强制性。
  • I use dry ice to test the physical constrains of certain metals.
    我用干冰来检测几种金属的物理强度。
  • We'll ignore the continuity constrains.
    我们往往忽略连续约束条件。
  • A business rule is a statement that defines or constrains some aspect of a business.
    业务规则是对业务的某个方面进行定义或约束的语句。
  • In this manner, the committee's input constrains the administrator's discretion.
    从这个角度,咨询委员会的引入抑制了行政官员的裁量权。
  • Research of the job-shop scheduling problem with due date and capacity constrains
    基于交货期和设备能力约束的作业车间调度方法研究
  • Constrains on the new system such as timing, financial, staffing constrains should be identified.
    对新系统的种种规定,如时间安排、经费、和人员的规定都应明确。
  • Sizing and scoping drives every aspect of the project, constrains the actions that can be taken in the development or upgrade of a product, and limits available options.
    确定规模和范围是驱动项目各个方面的动力,约束那些在产品的开发和升级中所采用的行动,以及限制可以提供的选项。
  • In this paper a new exact algorithm is proposed for solving project scheduling problems under multiple resource constrains which is based on the branch and bound procedure.
    基于分支定界法的思想提出了一种新的精确求解多资源约束下项目进度规划问题的最优化算法。