subcontract
英 [ˌsʌbkənˈtrækt , ˌsʌbˈkɒntrækt]
美 [ˌsʌbˈkɑːntrækt]
v. 分包; 转包
n. 分包合同; 转包合同
现在分词:subcontracting 过去分词:subcontracted 过去式:subcontracted 复数:subcontracts 第三人称单数:subcontracts
BNC.22343 / COCA.25876
牛津词典
verb
- 分包;转包
to pay a person or company to do some of the work that you have been given a contract to do- We subcontracted the work to a small engineering firm.
我们把工作转包给了一家小型工程公司。 - We subcontracted a small engineering firm to do the work.
我们转包给了一家小型工程公司去干那项工作。
- We subcontracted the work to a small engineering firm.
noun
- 分包合同;转包合同
a contract to do part of the work that has been given to another person or company
柯林斯词典
- VERB 将…分包;将…转包
If one firmsubcontractspart of its worktoanother firm, it pays the other firm to do part of the work that it has been employed to do.- The company is subcontracting production of most of the parts...
该公司外包了大部分零部件的生产。 - They are cutting costs by subcontracting work out to other local firms.
他们通过将任务转包给当地其他公司来减少成本。
- The company is subcontracting production of most of the parts...
- 分包合同;转包契约
Asubcontractis a contract between a firm which is being employed to do a job and another firm which agrees to do part of that job.
The verb is pronounced /ˌsʌbkən'trækt/. The noun is pronounced /sʌb'kɒntrækt/. 动词读作 /ˌsʌbkən'trækt/,名词读作 /sʌb'kɒntrækt/。
英英释义
noun
- a contract assigning to another party some obligations of a prior contract
verb
双语例句
- This procedure applies to contractor workers, subcontract, contractor workers and visitors entering the CSPC-DB Project.
本程序适用于本项目的承包商员工、分包商员工和进入CSPC&改扩建项目的来访者。 - Yes, we subcontract almost all the joiner work.
是的,我们把所有的细木工舾装都分包了出去。 - The Contractor shall ensure that the rights of the company and the requirements in the contract regarding subcontractors are effectively provided for in each subcontract.
承包商应确保本合同中业主的权利和对分包商的要求有效体现在各分包合同中。 - They are cutting costs by subcontracting work out to other local firms.
他们通过将任务转包给当地其他公司来减少成本。 - DNV shall have the right to transfer, assign or subcontract all or parts of its rights and duties under this Agreement to any of its sister companies or subsidiaries.
DNV应有权把本协议的全部或部份权利和责任转移、转让或分包给其任何一间姊妹公司或附属公司。 - Subcontractor is not the cause of the delay to the Subcontract Time Schedule.
分包商是不是推迟的原因的分包合同的时间表。 - Yes, we subcontract almost all the joiner work. This will save us lots of time.
是的,我们把所有的细木工舾装都分包了出去。这将节约我们很多的时间。 - 1 "subcontract" means the agreement and the other documents listed in the appendix.
“分包合同”指合同协议和附录中所列的其它文件。 - The company is subcontracting production of most of the parts
该公司外包了大部分零部件的生产。 - We buy all the bits for our valves through a subcontract network in Europe.
我们阀门的所有零件都是通过欧洲转包网络购得的。