subcontract
英 [ˌsʌbkənˈtrækt , ˌsʌbˈkɒntrækt]
美 [ˌsʌbˈkɑːntrækt]
v. 分包; 转包
n. 分包合同; 转包合同
现在分词:subcontracting 过去分词:subcontracted 过去式:subcontracted 复数:subcontracts 第三人称单数:subcontracts
BNC.22343 / COCA.25876
牛津词典
verb
- 分包;转包
to pay a person or company to do some of the work that you have been given a contract to do- We subcontracted the work to a small engineering firm.
我们把工作转包给了一家小型工程公司。 - We subcontracted a small engineering firm to do the work.
我们转包给了一家小型工程公司去干那项工作。
- We subcontracted the work to a small engineering firm.
noun
- 分包合同;转包合同
a contract to do part of the work that has been given to another person or company
柯林斯词典
- VERB 将…分包;将…转包
If one firmsubcontractspart of its worktoanother firm, it pays the other firm to do part of the work that it has been employed to do.- The company is subcontracting production of most of the parts...
该公司外包了大部分零部件的生产。 - They are cutting costs by subcontracting work out to other local firms.
他们通过将任务转包给当地其他公司来减少成本。
- The company is subcontracting production of most of the parts...
- 分包合同;转包契约
Asubcontractis a contract between a firm which is being employed to do a job and another firm which agrees to do part of that job.
The verb is pronounced /ˌsʌbkən'trækt/. The noun is pronounced /sʌb'kɒntrækt/. 动词读作 /ˌsʌbkən'trækt/,名词读作 /sʌb'kɒntrækt/。
英英释义
noun
- a contract assigning to another party some obligations of a prior contract
verb
双语例句
- Keywords: EPC Contract, Scope of Work, Design Subcontract.
主题词:EPC合同,工作范围,设计分包。 - We buy all the bits for our valves through a subcontract network in Europe.
我们阀门的所有零件都是通过欧洲转包网络购得的。 - Subcontract Management System for Our Country's Construction Work
我国建筑工程建设分包管理体系研究 - They are cutting costs by subcontracting work out to other local firms.
他们通过将任务转包给当地其他公司来减少成本。 - Yes, we subcontract almost all the joiner work.
是的,我们把所有的细木工舾装都分包了出去。 - Subcontractor is not the cause of the delay to the Subcontract Time Schedule.
分包商是不是推迟的原因的分包合同的时间表。 - They have been award the subcontract for all the electrical work in the new building.
他们已拿到了这座新建筑物所有电气工作的转包合同。 - Within direct costs, expenses are divided into material, subcontract, temporary work and machinery costs.
在直接成本里面,又将支出划分为材料费、合同分包费、临时工作费和机械费。 - Seller to the buyer must provide the equipment manufacturing factory in the processing, can not subcontract.
卖方向买方提供的设备必须在本厂制造加工,不得转包。 - The Contractor shall not enter into any subcontract without the prior written consent of the company.
未经业主事先书面同意,承包商不得签订任何分包合同。